IMPROVEMENT OF DECISION-MAKING IN CONSTRUCTION THROUGH RELIABLE AND TIMELY INFORMATION
DOI:
https://doi.org/10.14529/em160307Keywords:
reporting, scheduling, decision-making, computer aid, KPI, lag time, construction management, investment.Abstract
Construction firms usually perform certain part of production with their own force and the rest is obtained
through subcontractors. The operation based methods of project scheduling are currently widespread within
sector, whereas, available finance and resources are usually of the highest priority. Thus, multi-objective analysis
within scheduling process was addressed throughout the research. Accurate information is the key factor for
securing smooth construction execution as the sector is characterized by numerous variations in time. The activities
of progress recording and reporting are often carried out as heterogeneous and segregate processes,
however, their integration offers significant enhancements. Therefore, KPI based alert system together with
standardized information input were suggested.
References
Caldas, C.H. and Soibelman, L. (2003)
Automating hierarchical document classification for
construction management information systems.
Automation in Construction, 12(4). DOI:
1016/s0926-5805(03)00004-9
El-Abbasy, S., Zayed, T. and Elazouni, A.
(2012) Finance-based scheduling for multiple projects
with multimode activities. In Construction Research
Congress 2012, pp. 386–396. DOI:
1061/9780784412329.039
Gusev, E.V., Buzyrev, V.V., Savel'eva, I.P.
and Fedoseev, I.V. (2010). Planirovanie na
stroitelnom predpriyatii [Planning in a construction
company]. Moscow, KnoRus Publ.
Halpin, D.W. and Bolivar, A. (2010)
Construction Management. 4th edition. John Wiley &
Sons: United States of America.
Lamptey, W.N. and Fayek, A.R. (2012)
Developing a Project Status Dashboard for
Construction Project Progress Reporting.
International Journal of Architecture, Engineering
and Construction, 1(2), pp. 112–120. DOI:
7492/ijaec.2012.013
Mincks, W.R. and Johnston, H. (2011)
Construction Jobsite Management. 3rd ed. Cengage
Learning: USA.
Peansupap, V. and Walker, D.H. (2006).
Information communication technology (ICT)
implementation constraints: A construction industry
perspective. Engineering, construction and
architectural management, 13(4), pp. 364–379. DOI:
1108/09699980610680171
Polesie, P., Frödell, M. and Josephson, P.E.
(2009) Implementing Standardisation in Medium-Sized
Construction Firms: Facilitating Site Managers’ Feeling
of Freedom through a Bottom-up Approach. In
Proceedings for the 17th Annual Conference of the
International Group for Lean Construction, pp. 317–326.
Zhou, J., Love, P.E., Wang, X., Teo, K.L. and
Irani, Z. (2013) A review of methods and algorithms
for optimizing construction scheduling. Journal of the
Operational Research Society, 64(8), pp. 1091–1105.
DOI: 10.1057/jors.2012.174