IMPROVEMENT OF DECISION-MAKING IN CONSTRUCTION THROUGH RELIABLE AND TIMELY INFORMATION

Authors

  • Tomash Buchal Czech Technical University in Prague (Czech Republic)
  • Artem A. Vasilchenko South Ural State University, Chelyabinsk
  • Evgeny V. Gusev South Ural State University, Chelyabinsk

DOI:

https://doi.org/10.14529/em160307

Keywords:

reporting, scheduling, decision-making, computer aid, KPI, lag time, construction management, investment.

Abstract

Construction firms usually perform certain part of production with their own force and the rest is obtained
through subcontractors. The operation based methods of project scheduling are currently widespread within
sector, whereas, available finance and resources are usually of the highest priority. Thus, multi-objective analysis
within scheduling process was addressed throughout the research. Accurate information is the key factor for
securing smooth construction execution as the sector is characterized by numerous variations in time. The activities
of progress recording and reporting are often carried out as heterogeneous and segregate processes,
however, their integration offers significant enhancements. Therefore, KPI based alert system together with
standardized information input were suggested.

Author Biographies

Tomash Buchal, Czech Technical University in Prague (Czech Republic)

PhD student of “Economics and Management in Civil Engineering”

Artem A. Vasilchenko, South Ural State University, Chelyabinsk

PhD student of “Economics and management at enterprises of construction and
land development”

Evgeny V. Gusev, South Ural State University, Chelyabinsk

Professor of “Economics and management at enterprises of construction and land development”

References

Caldas, C.H. and Soibelman, L. (2003)

Automating hierarchical document classification for

construction management information systems.

Automation in Construction, 12(4). DOI:

1016/s0926-5805(03)00004-9

El-Abbasy, S., Zayed, T. and Elazouni, A.

(2012) Finance-based scheduling for multiple projects

with multimode activities. In Construction Research

Congress 2012, pp. 386–396. DOI:

1061/9780784412329.039

Gusev, E.V., Buzyrev, V.V., Savel'eva, I.P.

and Fedoseev, I.V. (2010). Planirovanie na

stroitelnom predpriyatii [Planning in a construction

company]. Moscow, KnoRus Publ.

Halpin, D.W. and Bolivar, A. (2010)

Construction Management. 4th edition. John Wiley &

Sons: United States of America.

Lamptey, W.N. and Fayek, A.R. (2012)

Developing a Project Status Dashboard for

Construction Project Progress Reporting.

International Journal of Architecture, Engineering

and Construction, 1(2), pp. 112–120. DOI:

7492/ijaec.2012.013

Mincks, W.R. and Johnston, H. (2011)

Construction Jobsite Management. 3rd ed. Cengage

Learning: USA.

Peansupap, V. and Walker, D.H. (2006).

Information communication technology (ICT)

implementation constraints: A construction industry

perspective. Engineering, construction and

architectural management, 13(4), pp. 364–379. DOI:

1108/09699980610680171

Polesie, P., Frödell, M. and Josephson, P.E.

(2009) Implementing Standardisation in Medium-Sized

Construction Firms: Facilitating Site Managers’ Feeling

of Freedom through a Bottom-up Approach. In

Proceedings for the 17th Annual Conference of the

International Group for Lean Construction, pp. 317–326.

Zhou, J., Love, P.E., Wang, X., Teo, K.L. and

Irani, Z. (2013) A review of methods and algorithms

for optimizing construction scheduling. Journal of the

Operational Research Society, 64(8), pp. 1091–1105.

DOI: 10.1057/jors.2012.174

Published

2017-04-09

Issue

Section

Investment management and innovation