Review of the Technical Condition of Electrical Equipment in the Deve¬loping Energy System of the Republic of Tajikistan

Authors

  • Yu. P. Gusev National Research University “MPEI”, Moscow
  • A. G. Kayumov National Research University “MPEI”, Moscow

DOI:

https://doi.org/10.14529/power200109

Keywords:

technical condition of electrical equipment, electric power system, short circuit

Abstract

The paper analyses the technical condition of the electrical equipment currently installed at the power plants and substations in the electric power system of the Republic of Tajikistan (EPS RT) with account to
the system development prospects. Each of the EPS RT elements is considered separately, their service life as well as their quality condition are estimated. It is shown that as far as the 0.4–500 kV power lines are concerned, 18115 km (28.7 %) are in good condition, 32887 km (52.1 %) are in satisfactory condition, 12263 km (19.8 %) are in unsatisfactory condition. The paper also identifies the share of electrical equipment operating outside the standard service life, i.e. 78 % power transformers, 56 % high-voltage circuit breakers (HVCB), 70 % synchronous generators. It also analyzes the structure of system changes and the commissioning of the EPS RT basic units with a voltage of 110–500 kV in 2015–2039. When the power systems of the neighboring countries are connected to the EPS RT the levels of short-circuit currents (SCC) increase. The operation of worn-out equipment can cause numerous accidents, therefore, it is recommended to replace them with new equipment types, as well as continue the SCC coordination, checking the electrodynamic stability of power transformers, based on the HVCB breaking capacity.

Author Biographies

Yu. P. Gusev, National Research University “MPEI”, Moscow

-

A. G. Kayumov, National Research University “MPEI”, Moscow

-

References

Tajikistan: uglublennyy obzor energoeffektivnosti [In-depth Energy Efficiency Review]. Energy Charter Secretariat. Boulevard de la Woluwe, 56. B-1200 Brussels, Belgium, 2013.

Postanovleniye Pravitel’stva Respubliki Tadzhikistan ot 2 fevralya 2009 goda N 73 “Dolgosrochnaya

programma stroitel’stva malykh elektrostantsiy na period 2009–2020 godov” [Approved by the Decree of

the Government of the Republic of Tajikistan on February 2, 2009, no. 73 “The long-term program for the construction of small power plants for the period 2009–2020”].

Postanovleniye Madzhlisi namoyandagon Madzhlisi Oli Respubliki Tadzhikistan ot 28 dekabrya 2016 goda N 678 “Programma srednesrochnogo razvitiya Respubliki Tadzhikistan na 2016–2020 gody” [Ap-proved by

the resolution of the Majlisi Namoyandagon of the Majlisi Oli of the Republic of Tajikistan on December 28, 2016, no. 678 “The medium-term development program of the Republic of Tajikistan for 2016–2020”].

Postanovleniye Pravitel’stva Respubliki Tadzhikistan ot 29 maya 2010 goda N 280 “Plan meropriya-tiy po realizatsii prioritetnykh proyektov v energeticheskoy otrasli Respubliki Tadzhikistan na 2010–2015 gg.” [Decree of the Government of the Tajikistan Republic dated May 29, 2010 No. 280 “Plan of measures for the implementation of priority projects in the energy sector of the Tajikistan Republic for 2010–2015.”].

Official website of OAHK “Barki Tajik”. Available at: http://www.barqitojik.tj (accessed: 10.10.2019).

Tabarov, N.Kh. The state of electric networks of the Republic of Tajikistan. Bulletin of South Ural State University. Ser. “Energy”, 2019, vol. 19, no. 2, pp. 62–68. DOI: 10.14529 / power190207

Official website of the Ministry of Energy and Water Resources of the Republic of Tajikistan. Availa-ble at: http://www.mewr.gov.tj/?page_id=61&lang=ru (accessed: 10.10.2019).

Tavarov S.Sh., Majidov G.Kh., Firdavs Е.A. [State of electrical equipment in urban electrical networks of Dushanbe OAHK “Barki Tajik”]. Elektrobezopasnost’ [ELectrical Safety]. Chelyabinsk, South Ural St. Univ. Publ., 2016, no. 2, pp. 4–12. (in Russ.)

Tekhnicheskiy godovoy otchet po ispol’zovaniyu silovykh transformatorov, ekspluatiruyushchikhsya na elektricheskikh podstantsiyakh OAKHK “Barki Tochik” po sostoyaniyu na 11.11.2018 g. [Technical annual report on the use of power transformers operating at electrical substations of Barki Tojik OAHK as of 11.11.2018].

Chorshanbiev S.R., Shvedov G.V. Analysis of generation, transmission and consumption of electric energy in the national energy company OAHK “Barki Tajik” of the Republic of Tajikistan. Polytechnic Bulle-tin. Series: Engineering Research, 2018, no. 4 (44), pp. 27–35. (in Russ.)

ADB – TA 7558 – Central Asian Regional Economic Cooperation: Master Plan for Regional Energy Cooperation. Final report. Master Plan September 2012.

Karias A., Lian G., Amal Mani. Tajikistan Energy Sector Master Plan – Final Report. Regional project for electric power transmission improving operational activities of the sector. ADB Grant, no. 0213 TAJ, vol. 1, February 2017. 253 p.

Karias A., Lian G., Amal Mani. Tajikistan Energy Sector Master Plan – Final Report. Regional project for electric power transmission improving operational activities of the sector. ADB Grant, no. 0213 TAJ, vol. 2, February 2017. 285 p.

Central Asia – South Asia Electricity Transmission and Trade Project (CASA-1000). Series final re-port. Final. Release unit transfer and distribution. Team Auth. SNC-Lavalin International Inc, February 2011.

SO 153-34.20.118-2003. Metodicheskiye rekomendatsii po proyektirovaniyu razvitiya energosistem. Utverzhdeny prikazom Minenergo Rossii ot 30.06.03 N 281 [Guidelines for designing the development of en-ergy systems].

RD 34.20.175-76. Ukazaniya po ogranicheniyu tokov korotkogo zamykaniya v setyakh napryazheni-yem 110 kV i vyshe. Utverzhdeny Ministerstvom energetiki i elektrifikatsii SSSR 17.04.1975 [Guidelines for limiting short circuit currents in networks of 110 kV and higher].