Increasing Operational Efficiency of Overhead Power Lines with Back-Up Phase

Authors

  • A. S. Nesterov Institute of Physical and Technical Issues of the North, RAS SB, Yakutsk
  • M. P. Lebedev Institute of Physical and Technical Issues of the North, RAS SB, Yakutsk
  • V. P. Kobylin Institute of Physical and Technical Issues of the North, RAS SB, Yakutsk
  • P. F. Vasilyev Institute of Physical and Technical Issues of the North, RAS SB, Yakutsk
  • G. I. Davydov Institute of Physical and Technical Issues of the North, RAS SB, Yakutsk
  • A. M. Khoiutanov Institute of Physical and Technical Issues of the North, RAS SB, Yakutsk

DOI:

https://doi.org/10.14529/power160406

Keywords:

overhead power lines with a backup phase, asymmetry, split backup wire, double-circuit line, backup, capacity, maintainability, reliability, automatic reclosing

Abstract

The article deals with a transmission line reservation device based on a design and technical solution providing replacement of traditional double-circuit transmission with a backup phase single circuit. The design and technical solution splits the backup phase into three components to be connected in parallel to operation phases of the overhead transmission line under normal operation conditions providing the symmetry of resistances and voltages. The greatest number of overhead transmission line failures are due to one-phase damages of the operation circuit. In this case, components of the split backup phase are united with switches and automatically connected to the operation circuit instead of the damaged one. It increases operational reliability of the wiring diagram, maintainability and capacity of the transmission line.

Author Biographies

A. S. Nesterov, Institute of Physical and Technical Issues of the North, RAS SB, Yakutsk

-

M. P. Lebedev, Institute of Physical and Technical Issues of the North, RAS SB, Yakutsk

-

V. P. Kobylin, Institute of Physical and Technical Issues of the North, RAS SB, Yakutsk

-

P. F. Vasilyev, Institute of Physical and Technical Issues of the North, RAS SB, Yakutsk

-

G. I. Davydov, Institute of Physical and Technical Issues of the North, RAS SB, Yakutsk

-

A. M. Khoiutanov, Institute of Physical and Technical Issues of the North, RAS SB, Yakutsk

-

References

Kurnosov A.I., Lyskov Y.I., Tikhodeev N.N. [1150 kV Overhead Power Lines with High Natural Ca-pacity and Bandwidth]. Proceedings of NIIPT, Moscow, 1985, pp. 6–20. (in Russ.)

Aleksandrov G.N. Peredacha elektricheskoy energii peremennym tokom [Transfer of Alternating Cur-rent Power]. Moscow, Energoatomizdat, 1990. 176 p.

Belyakov N.N., Rashkes V.S., Levinstein M.L. et al. [Prospects of the ARE in 1150 kV Power Trans-mission]. 1150 kV power transmission, Moscow, Energoatomizdat, 1992, pp.129–158. (in Russ.)

Kalyuzhny A.А., Kochetygov V.A., Levinstein M.L. et al. [Using of Static Thyristor Compensators in Long-Term Open-Phase Modes of Transmission Lines]. Izv. SO AN SSSR. Ser. Tekhn. Nauk [Bulletin of Sibe-rian Branch of the Russian Academy of Sciences, USSR], 1985, vol. 1, no. 4.

Krasilnikova T.G. [Selection and Justification of the Overhead Line with Reserve Phase Design. Mate-rials of the Intern. Scientific and Engineering Conf.]. Alternating Current Transfer over Long and Very Long Distances. Novosibirsk, 2003, pp. 118–127. (in Russ.)

Nesterov A.S., Lebedyev M.P., Kobylin V.P., Vassilyev P.Ph. Ustroystvo rezervirovaniya el-ektroperedachi [Power Line Backup Device]. Patent RF, no. 2578040, 2016.

Published

2017-03-26

Issue

Section

Electric power engineering