Calculation and analysis of overhead transmission line capacity

A. S. Nesterov, P. F. Vasilyev, V. P. Kobylin

Abstract


Power transport is the most important component of an electric power system. Modernization and optimization of its operation, increase in capacity, as well as variation in connection circuitry with maintained or improved reliability is a crucial objective for the whole energy industry. The paper is about crea­ting a circuit-technical solution for a dual-circuit three-phase power transmission line whereby we define a new operating mode “with a split backup phase”. We herein describe conventional and non-conventional types of AC transmission such as overhead transmission lines, six-phase power lines, and flexible alternating current transmission systems (FACTS). We further analyze ways to improve the efficiency of overhead power transmission lines using structural and functional redundancy. A circuit-technical solution for a dual-circuit power transmission line with expanded operating modes is considered in detail. Possible
operating modes of dual-circuit power lines are described. We also consider ways to increase the natural capacity of such lines. We have calculated the capacity of split backup phase lines and present the results of our calculations herein along with an analysis of such capacity in comparison to that of conventional transmission lines.


Keywords


functional redundancy; backup phase; overhead transmission line; line capacity; wave impedance

References


Zhanaev D.T., Zaslavskaya T.B. Linii elektroperedach s rezervnoy fazoy [Power Lines with a Backup Phase]. Saratov, Saratovskiy Universitet Publ., 1990. 120 p.

Horowitz S.H., Phadke A.G., Renz B.A. The Future of Power Transmission. IEEE Power and Energy Magazine, 2010, vol. 8, no. 2, pp. 34–40. DOI: 10.1109/MPE.2009.935554

Stewart J.R., Grant I.S. High Phase order – Ready for Application. IEEE Transactions on Power Appa-ratus and System, 1982, vol. 101, no. 6, pp. 1757–1767. DOI: 10.1109/TPAS.1982.317229

Nesterov A.S., Lebedev M.P., Kobylin V.P., Vasilyev P.F., Davydov G.I., Khoiutanov A.M. Increasing Operational Efficiency of Overhead Power Lines with Back-Up Phase. Bulletin of the South Ural State Uni-versity. Ser. Power Engineering, 2016, vol. 16, no. 4, pp. 45–48. (in Russ.) DOI: 10.14529/power160406

Glazunov A.A. Elektricheskie seti i sistemy [Power Networks and Systems]. Moscow, Gosyenergizdat Publ., 1960. 368 p.

Lyskov Yu.I., Kurnosov A.I., Tikhodeev N.N. [Compact 330, 500 and 750 kV Overhead Transmission Lines Using Portal-Design Transmission Towers]. Izv. AN SSSR. Energetika i transport [Proceedings of the USSR Academy of Sciences. Energy and Transport], 1984, no. 4, pp. 3–11. (in Russ)

Transmission line reference book: 115–138 kV. Compact line designs. EPRI, 1978.

Paris L. Die Zukunft der Ultra – Hochspannungsleitungen. Elektrizitätswirtschaft, 1970, no. 19,

pp. 514–520.

Koz'ma A.A. Elektricheskie stancii, seti i sistemy [Power Plants, Networks, and Systems]. Kharkiv, University of Kharkiv Publ., 1963. 380 p.

Faybisovich D.L. (Ed.) Spravochnik po proektirovaniyu elektricheskikh setey [Handbook on Power Network Design]. 3rd ed. Moscow, ENAS Publ., 2009, 392 p.

Nesterov A.S., Lebedev M.P., Kobylin V.P., Vasil'ev P.F. Ustrojstvo rezervirovaniya linii elektrope-redachi [Power Line Backup Device]. Patent RF, no. 2578040, 2016.

Aleksandrov G.N. Novye sredstva peredachi elektroenergii v energosistemakh [New Ways to Trans-mit Power in Power Systems]. Leningrad, University of Leningrad Publ.,1987. 231 p.

Davydov G.I., Kobylin V.P., Kobylin A.V., Li-Fir-Su R.P., Sedalishchev V.A., Nesterov A.S. [Alter-native Power Sources for Enterprises in the Industrial Centers of the Sakha Arctic Zone]. Russian Electrical Engineering, 2017, no. 9, pp. 84–88. (in Russ.)




DOI: http://dx.doi.org/10.14529/power180103